Home / Legal templates / Writer subcontractor agreement
Subcontractor agreement template for freelance writers
A family book can pass through four pairs of hands before the client reads a page: the writer, a transcriber, a researcher and a fact-checker. The client signed a contract with one of them. The other three are working on a handshake and a WhatsApp. This is not a lawyer-drafted document. It puts that handshake in writing, so the promises the writer made to the client reach everyone the writer hires.
A writer subcontractor agreement is the contract a freelance writer signs with the researcher, transcriber, fact-checker or second writer they hire for a client’s book. It sets the work, the fee and the date the writer pays, carries the writer’s own confidentiality and AI promises down to the subcontractor, and assigns copyright to the writer so it can pass on to the client. This free template covers each point in 13 clauses, with a plain-English note under every clause.
- Who signs
- The writer who holds the contract with the client, and the researcher, transcriber, fact-checker or second writer the writer hires. The client does not sign.
- When
- After the writer’s own contract with the client is signed, and before the subcontractor hears a recording or sees a name.
- Length
- 13 clauses, each with a plain-English note
- Formats
- Word and PDF. Free, no sign-up.
Not legal adviceThis is a template, not a lawyer-drafted legal document and not legal advice. It replaces the verbal agreement most of this work runs on, so both sides have the terms in writing. Laws differ by country and by state. Have a lawyer where you live read it before anyone signs. I am a writer, not a lawyer. These are the documents I would want in place, written in plain English so you can see what each line does.
The contract, clause by clause
Each clause reads as it does in the download. Type straight into the blanks and tick the options you want (a line with a box is an option: keep one), then download your filled copy in Word or PDF from the bar at the bottom. Nothing you type leaves your browser.
The parties and the project
1.1This agreement is made on [DATE] between [WRITER FULL NAME OR COMPANY], of [ADDRESS] (the “Writer”), and [SUBCONTRACTOR FULL NAME OR COMPANY], of [ADDRESS] (the “Subcontractor”).
1.2The Writer has agreed to write [DESCRIPTION, FOR EXAMPLE A MEMOIR OF ABOUT 70,000 WORDS] (the “Project”) for [CLIENT NAME, OR A CODE NAME IF THE CLIENT AGREEMENT KEEPS THE NAME CONFIDENTIAL] (the “Client”), under an agreement dated [DATE] (the “Client Agreement”).
1.3The Writer hires the Subcontractor to help with the Project as set out in clause 2. The Subcontractor’s contract is with the Writer alone. The Client is not a party to it.
What it meansUse a code name if your own contract keeps the client’s name private. The last paragraph is the shape of the whole arrangement: the subcontractor bills you and answers to you, and you answer to the client for their work.
The work
2.1The Subcontractor will do the work ticked below (the “Work”). Strike what does not apply.
☐ Research: [TOPICS, PLACES AND YEARS], with a source for every fact.
☐ Transcription: [NUMBER] hours of interview audio, typed [VERBATIM / CLEAN VERBATIM], with speaker names and a timestamp every [2] minutes.
☐ Fact-checking: every name, date, place and figure in [CHAPTERS OR PAGES], each marked confirmed, corrected or unconfirmed, with its source.
☐ Writing: [CHAPTERS, SECTIONS OR WORD COUNT], from the Writer’s outline and material, in the voice and style the Writer sets.
2.2Deliverables and dates are in Schedule 1. The Writer will tell the Subcontractor within [7] days of each delivery if it falls short of this clause, with reasons. If the Writer says nothing in that time, the delivery is accepted.
2.3Anything not listed here, including extra hours, is outside this agreement unless the Writer agrees to it in writing first.
What it meansWrite the job the way you would brief it on a call, then put numbers on it. Verbatim or clean verbatim. How often the timestamps fall. What counts as a source. The acceptance window works for both sides: the subcontractor is not left waiting for a verdict, and the writer gets a week to read.
The fee
3.1The Writer will pay the Subcontractor [AMOUNT AND CURRENCY] for the Work, or [RATE] per [HOUR / AUDIO HOUR / 1,000 WORDS] up to a cap of [AMOUNT], plus any GST, VAT or other tax that applies.
3.2The Subcontractor invoices [ON DELIVERY OF EACH ITEM IN SCHEDULE 1 / AT THE END OF EACH MONTH].
3.3Expenses such as archive fees, document copies or travel are paid by the Writer at cost, against receipts, if the Writer approves them in writing before they are spent.
3.4The fee does not depend on what the Client thinks of the Writer’s own work. It changes only if the Subcontractor’s Work falls short of clause 2 and is not put right within [7] days of the Writer’s written notice.
What it meansA cap on an hourly rate is the line that stops a three-day research job turning into a three-week invoice. The last paragraph protects the subcontractor. If the client hates chapter four for reasons that have nothing to do with the research, the researcher still gets paid.
When the Writer pays
4.1The Writer pays each invoice under one of these two options. Keep one and strike the other.
☐ On a fixed date: within [14] days of receiving the invoice, whether or not the Client has paid the Writer.
☐ When the Writer is paid, with a longstop: within [7] days of the Writer receiving the Client’s payment for the stage that includes the Subcontractor’s Work, and in any case no later than [45] days after receiving the invoice, whether or not the Client has paid by then.
4.2If the second option applies, the Writer will tell the Subcontractor within [3] days of the Client paying for that stage.
4.3Late payment carries interest at [RATE] a year, or the rate the law sets if that is higher.
What it meansThis is the clause subcontractors ask about first. The fixed date is the clean option. The second option lets the writer wait for the client’s money, and its longstop date means the subcontractor is paid even if the client never pays. A clause with no longstop, where the subcontractor is paid only if the client pays, is the version the law treats with most suspicion; the country notes below say where. The default of 45 days sits inside the Indian limit for registered small businesses and under the UK’s 60-day line.
Confidentiality
5.1The Subcontractor will keep confidential everything learned through the Project, including the Client’s identity, what is said in interviews, what is left out of the book, the drafts, the documents and research, and the fact that the Project exists.
5.2These duties are at least as strict as the Writer’s own duty of confidentiality to the Client. The Writer has given the Subcontractor a copy of that duty from the Client Agreement, and the Subcontractor agrees to it on the same terms.
5.3The Subcontractor will share confidential material with no one, including their own assistants or subcontractors, without the Writer’s prior written consent. Anyone the Writer approves must first sign terms as strict as these.
5.4This clause does not cover information that is public through no fault of the Subcontractor, or that the law requires the Subcontractor to disclose, after telling the Writer first where the law allows. It continues after this agreement ends, with no end date.
What it meansThe writer has already promised the client silence, often with no end date. That promise is only as good as the least careful person on the team. So the subcontractor signs the same promise, word for word if need be. The ghostwriting contract on this site lets the writer share material with a transcriber or researcher only if they are bound in writing. This clause is that writing.
Interview recordings and personal data
6.1Recordings, transcripts and notes for the Project hold personal data about the Client, the subject of the book and the people interviewed, some of it sensitive: health, religion, money, family. The Subcontractor will handle that data only on the Writer’s written instructions and only for the Work.
6.2The Subcontractor will: (a) keep it only in the places listed in Schedule 1, behind a password and two-step sign-in; (b) not copy it to personal devices, messaging apps or email beyond what the Work needs; (c) not pass it to anyone without the Writer’s prior written consent; (d) tell the Writer within [48] hours of any loss, theft or access by someone not allowed to see it; and (e) help the Writer answer any request from a person in the recordings to see, correct or delete their data.
6.3The Subcontractor will not hold or open Project material outside [COUNTRY OR COUNTRIES] without the Writer’s written consent.
6.4Within [14] days of finishing the Work, or sooner if the Writer asks, the Subcontractor will return or delete every recording, transcript, note and copy, and confirm in writing that it is done. Copies in automatic backups may stay until they are overwritten, and remain confidential.
What it meansInterview tapes are the most sensitive thing in a family book. An aunt talking about a diagnosis. A father talking about money. Data laws in India, the UK, the UAE and Singapore all look for a written contract between whoever decides what happens to that data and whoever handles it for them. This clause is that contract, in plain words. The deletion date matters most. A transcriber’s laptop full of three-year-old interviews is a leak waiting for a thief.
Use of AI
7.1The Subcontractor will not use any AI tool to write, rewrite, summarise or edit text for the Project, to invent or tidy a quote, or to research or check a fact, except as this clause allows.
7.2The Subcontractor may use AI tools only for the uses below. The Writer strikes any use the Client Agreement does not allow.
☐ Transcription of recordings, with every quotation the Writer may use checked against the audio by the Subcontractor.
☐ Searching and sorting transcripts by person, place and year.
☐ Translating source documents for the Writer’s reference, with each translation marked as machine translation.
7.3Any tool that receives Project material must be set so the material is not used to train an AI model. The Subcontractor will name each tool to the Writer before first use, and will add no other tool without the Writer’s written consent.
What it meansIf your contract with the client limits AI, the limit has to reach everyone who touches the book. A researcher who asks a chatbot for dates, or a second writer who polishes a chapter with one, puts the writer in breach without the writer knowing. Strike any use your own contract does not allow. The first two uses match the AI clause in the ghostwriting contract.
Copyright
8.1The Subcontractor assigns to the Writer all copyright and other rights in everything the Subcontractor makes for the Project, including research notes, transcripts, fact-check reports, outlines and text (the “Work Product”).
8.2The assignment covers the whole world, the full term of copyright, and every form and medium, now known or developed later, including print, ebook, audiobook, film, television, stage, translation and online use. It includes the right to assign the Work Product on to the Client, the Client’s publisher or anyone else, without further consent or payment.
8.3Copyright in each item passes to the Writer when it is paid for. No royalty or further payment is due for the assignment. It does not lapse if the Writer or the Client does not use the Work Product within one year, or at all.
8.4The Subcontractor confirms that the Work Product is their own work, copied from no other published work except quotations and sources marked as such, and that no one else has a claim on it. The Subcontractor will sign any further document the Writer or the Client reasonably needs to record the assignment.
What it meansThe client expects to own the whole book. The writer can only hand over what the writer owns, and a second writer’s chapters belong to the second writer until they sign them away. This clause closes that gap and lets the rights pass straight on to the client. It names the rights, the territory, the term and the royalty because Indian law asks for all four. It uses an assignment and leaves out work-for-hire wording; the US note explains why.
Credit
9.1The Subcontractor is not named in or on the book, or in publicity for it, unless the Writer agrees in writing. Keep one option and strike the others.
☐ No credit anywhere.
☐ Thanked in the acknowledgements, in words the Writer and the Client approve, if the Client agrees.
☐ Credited as [FOR EXAMPLE, RESEARCHER] on [THE COPYRIGHT PAGE / THE WRITER’S WEBSITE].
9.2To the extent the law allows, the Subcontractor waives, or agrees not to assert, any right to be identified as author of the Work Product beyond the option chosen above, and consents to it being edited, cut, combined and adapted.
9.3Portfolio: ☐ The Subcontractor may describe the kind of work done, without naming the Client, the subject or the book. ☐ The Subcontractor will not mention the Project to anyone.
What it meansIn a ghostwritten book the writer’s own name can be missing from the cover. A researcher’s name cannot appear where the writer’s does not. The portfolio line lets a subcontractor show the next writer what they can do, without a name that breaks the client’s confidence.
The Client and the people in the book
10.1The Subcontractor will not contact the Client, the Client’s family or anyone interviewed for the Project except as the Writer arranges, and will pass any approach from them to the Writer within [2] days.
10.2The Subcontractor will not speak for the Writer or the Client, or make any promise on their behalf.
☐ For [12] months after this agreement ends, the Subcontractor will not offer to work on the Project, or on another book about the same subject, for the Client without the Writer’s written consent. This does not stop the Subcontractor working for anyone in any other way.
What it meansThe client hired the writer, and the writer holds that relationship. One email from a transcriber to the family about a deadline or a fee can undo months of trust. The optional last paragraph is narrow on purpose: this book, this client, one year. A wider ban on working for the client can be void, as the India and US notes explain.
Independent contractor
11.1The Subcontractor is an independent contractor and is not an employee, partner or agent of the Writer. The Subcontractor uses their own equipment, sets their own hours within the dates in Schedule 1, pays their own tax, and is free to work for others.
11.2Nothing in this agreement makes the Writer responsible for the Subcontractor’s insurance, pension, leave or benefits.
What it meansOne business hiring another. Run it that way too: agree the output and the dates, and leave the hours to the subcontractor. A subcontractor who works set hours at your desk, on your laptop, starts to look like staff.
Stopping early
12.1Either party may end this agreement by [7] days’ written notice.
12.2If the Client Agreement ends, or the Client stops or pauses the Project, the Writer may end this agreement at once by written notice.
12.3In every case the Writer pays, under clause 4, for Work done up to the date of ending at the rates in clause 3 (a fixed fee in proportion to the Work done), plus approved expenses already spent. The Subcontractor delivers all Work Product, finished or not, and returns or deletes Project material under clause 6.
12.4Either party may end this agreement at once if the other breaches it and does not put the breach right within [7] days of written notice.
12.5Clauses 5, 6, 8, 9 and 10 continue after this agreement ends.
What it meansBooks stop. Clients fall ill, families fall out, money runs short. When the writer’s contract ends, the subcontractor’s has to be able to end with it, and the subcontractor is paid for what they did. What comes back is everything, half-finished transcripts included.
Disputes, law and the rest
13.1This agreement is governed by the laws of [COUNTRY, AND STATE OR EMIRATE IF ANY].
13.2If a dispute arises, the parties will first talk for [14] days. If that fails, ☐ the courts of [CITY] have exclusive jurisdiction ☐ the dispute goes to mediation in [CITY], then to arbitration by a sole arbitrator in [CITY].
13.3This agreement and its schedule are the whole agreement between the parties about the Work. Changes are valid only in writing signed or confirmed by email by both parties. It may be signed in counterparts and by electronic signature. If any clause is unenforceable, the rest of the agreement stands.
What it meansPick the law of the place where the writer would sue or be sued. A writer in Mumbai with a transcriber in Manila should choose one country and write it down. For a fee of a few thousand, a court is cheaper than arbitration.
Schedule 1: the brief
Project: [WORKING TITLE OR CODE NAME]
Client Agreement dated: [DATE]
Work: [FOR EXAMPLE, TRANSCRIBE 30 HOURS OF INTERVIEW AUDIO, CLEAN VERBATIM]
Deliverables and dates: [WHAT IS DUE, AND WHEN]
Fee: [AMOUNT, OR RATE AND CAP]
Where material is kept: [FOR EXAMPLE, THE WRITER’S SHARED DRIVE AND ONE TRANSCRIPTION SERVICE WITH TRAINING SWITCHED OFF]
Signatures
Take the contract with you
Writer Subcontractor Agreement: Word (.docx) to edit, PDF to print. Free, no sign-up. Blanks are highlighted. Or fill it in on this page and download it filled.
Know a writer who works on a handshake?
Most freelance work starts with a phone call and a promise. Then the invoice is late, or the scope doubles, and nobody wrote anything down. Send this contract to one writer, or one client, before their next job starts. It is free, it needs no sign-up, and it saves an argument later.
India and other countries
India
A promise to pay when the client pays is a contingent contract under section 31 of the Indian Contract Act 1872. Section 32 says it cannot be enforced until the client pays, and becomes void if that becomes impossible. So a clause that pays the subcontractor only if the client pays can leave them with nothing, which is why clause 4 carries a longstop date. If the subcontractor is registered as a micro or small enterprise, section 15 of the Micro, Small and Medium Enterprises Development Act 2006 caps any agreed payment period at 45 days from acceptance of the work, and section 16 adds compound interest at three times the bank rate notified by the Reserve Bank on late payment, whatever the contract says. Section 27 of the Contract Act makes a promise not to work in a trade void to that extent, so keep clause 10 to this book and this client. Under the Copyright Act 1957 the subcontractor owns what they write until they assign it. Section 19 needs the assignment in writing and signed, naming the rights, the territory and the term, or it falls back to five years and India only. The right to be named survives any assignment (section 57), so clause 9 is a promise not to use it. A subcontractor who handles interview recordings for someone else is a data processor under the Digital Personal Data Protection Act 2023, and section 8(2) allows that only under a valid contract. Its rules were notified on 14 November 2025, with an eighteen-month phase-in.
UK
The UK ban on pay-when-paid clauses, in section 113 of the Housing Grants, Construction and Regeneration Act 1996, covers construction contracts only. Outside construction, the Late Payment of Commercial Debts (Interest) Act 1998 lets a payment date depend on an event, such as the client paying (section 4(2C)). If that date lands more than 60 days after the work is done and invoiced, it stands only if it is not grossly unfair to the subcontractor; otherwise statutory interest runs from the end of day 60 (section 4(2E) and (2F)). Statutory interest is 8% above the Bank of England base rate, plus a fixed sum of £40, £70 or £100 per debt (section 5A). An assignment of copyright must be in writing and signed by the assignor (Copyright, Designs and Patents Act 1988, section 90). Future copyright can be assigned before the work exists (section 91), and moral rights can be waived in a signed document (section 87). If the writer handles interview recordings on the client’s behalf, UK GDPR Article 28 needs the client’s written go-ahead before another processor touches them, and the same data protection terms in the subcontract.
US
Contract law is state law, including how a court reads a pay-when-paid clause, so name the state. New York and California set freelance payment rules by statute. New York’s Freelance Isn’t Free Act (General Business Law sections 1410 to 1415) needs a written contract with a one-person freelancer for work worth US$800 or more, alone or across 120 days, stating the payment date or how it is set; with no date, payment is due within 30 days of the work being finished. California’s Freelance Worker Protection Act (Business and Professions Code sections 18100 to 18107) binds hiring parties in California from US$250, covers freelance writers, editors and content contributors to a book, has the same 30-day default, and voids any waiver. A transfer of copyright needs a signed writing (17 U.S.C. section 204). Chapters a second writer drafts for a memoir are not among the nine kinds of commissioned work that can be a work made for hire (17 U.S.C. section 101). In California a signed work-for-hire agreement makes the commissioning party the creator’s employer for workers’ compensation and unemployment insurance (Labor Code section 3351.5(c) and Unemployment Insurance Code section 686). So clause 8 assigns. California’s Business and Professions Code section 16600 voids a contract to the extent it restrains anyone from a lawful trade, which is why clause 10 stays narrow. The US Copyright Office registers only human authorship and asks for AI-generated text to be disclaimed (registration guidance, March 2023), so text a subcontractor generates with AI may carry no copyright to pass on.
UAE
Federal Decree-Law No. 38 of 2021 needs a transfer of an author’s economic rights to be in writing and to name the right, its purpose, the duration and the place (Article 9). Any right not named stays with the author, so clause 8 lists them. Moral rights, including the right to be named, cannot be assigned (Article 5), so clause 9 is a promise about how the subcontractor acts. Interview recordings are personal data under Federal Decree-Law No. 45 of 2021, and family, health and religious detail is sensitive personal data. Article 8 has a processor act on the controller’s instructions, under a contract that sets the scope, purpose and type of data, and erase the data when the processing period ends. Where more than one processor works on the same data, they need a written contract setting out each one’s role, or they share responsibility. Companies in free zones that have their own data protection law fall outside it (Article 2). The template does not rely on any UAE rule about pay-when-paid clauses, so keep the longstop date in clause 4.
Singapore, Canada and Australia
Singapore’s Building and Construction Industry Security of Payment Act 2004 makes pay-when-paid clauses unenforceable (section 9), but only in contracts for construction work and construction-related goods and services, so a writing subcontract sits outside it. All three countries need a copyright assignment in writing, signed by the assignor: Singapore’s Copyright Act 2021, section 138; Canada’s Copyright Act, section 13(4); Australia’s Copyright Act 1968, section 196(3). Moral rights can be waived in a signed document in Singapore (section 382) and in Canada (section 14.1(2)); in Australia the author gives written consent to named acts instead (section 195AWA). In Canada an author’s assignment ends 25 years after the author’s death, when the rights pass to the estate (section 14(1)). Under Singapore’s PDPA, a data intermediary working under a written contract carries the protection, retention and breach-notice duties, and the writer stays answerable as if the writer did the processing (section 4).
Questions people ask
What is a pay when paid clause?
A clause that ties the date a writer pays a subcontractor to the date the client pays the writer. In this template it comes with a longstop: the writer pays within 7 days of the client paying, and in any case within 45 days of the invoice.
Are pay when paid clauses enforceable?
It depends on the country, and the version that never pays if the client never pays carries the most risk. Singapore and the UK ban them in construction contracts only. In India a promise to pay only if the client pays cannot be enforced until the client pays, and a registered micro or small enterprise must be paid within 45 days whatever the contract says.
Can a freelance writer subcontract work?
Yes, unless the contract with the client forbids it, so read that contract first. If the work involves the client’s personal data, tell the client: in the UK a processor needs the client’s written go-ahead before bringing in another processor.
Who owns the copyright in a subcontractor’s work?
The subcontractor, until they assign it in a signed document. This template assigns it to the writer, so the writer can pass the whole book on to the client.
What should a subcontractor agreement include?
The work, the fee and the date it is paid, confidentiality, how recordings and personal data are handled, copyright, credit, AI use, contact with the client, and how either side can stop. This template covers each in 13 clauses.
Can a subcontractor work with my client after the project?
Not on this book for 12 months, if you keep the optional paragraph in clause 10. A wider ban can be void: section 27 of the Indian Contract Act and section 16600 of California’s Business and Professions Code both strike down promises not to work in a trade. Keep any such promise narrow, or strike it.
Hiring a writer for a family book?
Send me the contract you have been offered, or ask for mine. I respond within 48 hours, in confidence.